Note: The Chairman may change the listed order of items to accommodate visiting Ward Members and members of the public

Minutes:

In accordance with the Council’s procedure for public speaking on planning applications a representation was made as detailed below:

 

Schedule of Applications

 

Application Number

Representations From

DC/18/01029

Martin Jewers (Shelland Parish Meeting)

Jason Etherington (Objector)

Jonathan Cunningham (Applicant)

DC/18/02398

Alan Gunne-Jones (Agent)

Phil Horton (HM Department for Education)

 

46.1 Item 1

 

Application          DC/18/01029

Proposal             Planning Application- Change of Use of a grainstore into a function room and associated works

Site Location      SHELLAND-  Rockylls Hall, Shelland Green, Shelland, Stowmarket, IP14 3JF

Applicant             Mr J. Cunningham

 

46.2 The Case Officer presented the application to the Committee outlining the proposal on the site, the late papers before Members, and the Officer Recommendation.

 

46.3 The Case Officer responded to Members questions on issues including: the capacity of the venue, the noise report submitted to the Council, where the toilet facilities on the site would be, and the positioning of passing places.

 

46.4 Members considered the representation from Martin Jewers representing Shelland Parish Meeting.

 

46.5 The Parish Meeting representative responded to a question regarding traffic in the area and that he understood there had been a slight increase in traffic on the roads.

 

46.6 Members considered the representation from Jason Etherington, speaking as an Objector.

 

46.7 The Objector responded to Members’ questions on issues including: where he lived in the community, the distance to Haughley Park Barn (an existing venue) and whether the proposed passing places were on Village Greens.

 

46.8 Members considered the representation from Jonathan Cunningham, speaking as the Applicant.

 

46.9 The Applicant responded to Members’ questions on issues including: the capacity of the venue for events and meals, that external caterers would most likely be used, the different types of events that would be hosted, what outside space would be used, the entrances and exits to the venue, and the heritage impact.

 

46.10 The Planning Lawyer advised the Committee that special regard should be given to Heritage Assets and referred to the report from the Heritage Officer.

 

46.11 The Chair read out an email that had been received from Councillor John Matthissen, Ward Member, who had given his apologies for the meeting.

 

46.12 Members debated the application on the issues including: the red line of the proposal, the increased traffic movements that would be caused, the negative response from the local community, and a lack of detail regarding the use of the building connected to the building proposed for change of use.

 

46.13 Councillor Derrick Haley proposed that the application be deferred to undertake a site visit and requested further information on the application as follows to be reported back to the Committee.

 

-        Clarity on what is included within the red line site and proposal

-        Information about the listed building shown within the red line area

-        Details of the use of linked building as existing and proposed, including separation/ doors between the two uses

-        Details of the parking facilities

-        Further information on the sound attenuation and sound evaluation including clarity on issues raised within the report provided and detail of conditions to control this

-        Fire requirements including fire escape from the building

-        Information on the history of the site and the uses of other buildings on the complex

-        Details of the break-out areas(s)

-        Information on the right of way for farm traffic and relationship with access and parking for the proposal

-        Details of the Route 51 cycle route

-        Confirmation on any designation of The Green, such as Village Green designation.

 

46.14 Councillor Barry Humphreys MBE seconded the motion.

 

46.15 By a unanimous vote

 

46.16 RESOLVED

 

To defer the determination of the application in order to seek additional information, and subsequently a site visit.

 

The additional information requested is as follows:

 

-        Clarity on what is included within the red line site and proposal

-        Information about the listed building shown within the red line area

-        Details of the use of the linked building as existing and proposed, including separation/doors between the two uses

-        Details of the parking facilities

-        Further information on the sound attenuation and sound evaluation including clarity on issues raised within the report provided and detail of conditions to control this

-        Fire requirements including fire escape from the building

-        Information on the history of the site and the uses of other buildings in the complex

-        Details of the break-out area(s)

-        Information on the right of way for farm traffic and relationship with access and parking for the proposal

-        Details of the Route 51 cycle route

-        Confirmation on any designation of The Green, such as Village Green designation

 

 

46.17 A short comfort break was taken between 10:47-10:54.

 

46.18 Item 2

 

Application          DC/18/02398

Proposal             Planning Application – Demolition of existing school buildings and construction of new teaching building and refurbishment of current 6th form building, together with associated landscaping

Site Location      STOWMARKET-  Stowmarket High School, Onehouse Road, Stowmarket, Suffolk, IP14 1QR

Applicant             Wates Construction Ltd

 

46.19 The Case Officer presented the application to the Committee outlining the proposal, the layout of the site, the updated Officer Recommendation in the tabled papers and that the Officer Recommendation was for approval with conditions.

 

46.20 The Case Officer responded to Members’ questions on issues including: the re-use of materials from the demolition of the existing school, and the construction management plan in the conditions.

 

46.21 Members considered the representation from Alan Gunne-Jones, speaking as the Agent.

 

46.22 The Agent responded to Members’ questions on issues including: whether there had been any forward planning with regards to capacity at the school.

 

46.23 Members considered the representation from Councillor Lesley Mayes, speaking as the Ward Member for Stowmarket Central.

 

46.24 Philip Horton, representative from HM Department of Education, responded to Members’ questions on issues including: that pupil feedback was taken into account, and that the provision of places had been expanded to allow as much capacity as possible with the funding that was available and the restrictions pertaining to said funding.

 

46.25 Before the beginning of the Debate Councillor Andrew Stringer declared a non-pecuniary interest as he had been a former student at Stowmarket High School.

 

46.26 Members debated the application on the issues including: the design of proposal including the modern architecture and the opportunities that this would provide to students.

 

46.27 Councillor Andrew Stinger proposed that the application be approved as detailed in the updated Officer recommendation in the tabled papers.

 

46.28 Councillor Derrick Haley seconded the motion.

 

46.29 By a unanimous vote

 

46.30 RESOLVED

 

1)    Delegate to the Corporate Manager - Growth and Sustainable Planning to grant planning permission, subject to conditions including:

 

 • Standard time limit

• Approved Plans

• Contaminated land discovery requirements

• Highways – loading / unloading

• Highways – refuse / recycling

• Highways – deliveries management plan

• Travel plan details and implementation

• Materials

• Levels

• Landscaping details and implementation

• Fire hydrant provision details

• Sustainable efficiency measures

• Biodiversity mitigation and ecology enhancement measures

• Construction Management Plan including hours of work

• Surface Water Management (SWM) and Flood Risk Assessment (FRA) implementation

• Sustainable Urban Drainage System components

• Construction Surface Water Management Plan (CSWMP) details

 

 