Minutes:
123.1 Item 1
Application DC/19/00657
Proposal Full Planning Application- Erection of 2no. B8 storage buildings and link extension between buildings 6 and 7.
Site Location EYE – Land on Eye Airfield, Ipswich Road, Eye, Suffolk
Applicant RH Developments (East Anglia) Ltd
123.2 The Case Officer presented the application to the Committee outlining the proposal, the layout of the site, and the officer recommendation of approval with conditions.
123.3 The Case Officer responded to Members’ questions on issues including: the renewable energy provision of the proposal, the location for Owl nesting boxes, ecology measures, and the history of the site and associated buildings.
123.4 Members debated the application on the issues including: the employment that would be created by the site, and the evolving nature of the business park.
123.5 Councillor Derrick Haley proposed that the application be approved as detailed in the officer recommendation with the amendment as follows:
· Location of nesting boxes to be agreed.
123.6 Councillor Roy Barker seconded the proposal.
123.7 By a unanimous vote
123.8 RESOLVED
That authority be delegated to Acting Chief Planning Officer to GRANT FULL PLANNING PERMISSION for the development subject to conditions as summarised below
· Standard time limit (3yrs for implementation of scheme)
· Approved Plans (Plans submitted that form this application)
· Control over hours of operation
· Control over noise emissions from plant, equipment and machinery
· External lighting to be kept to a minimum necessary and prevent upward and outward light radiation
· Limitation on hours of construction
· Control over materials arising from site clearance and construction phases
· Details of the strategy for the disposal or surface water and details for the implementation, maintenance and management of the strategy
· No occupation until details of SUDS are submitted and approved
· Agreement and implementation of a Construction Surface Water Management Plan
· Submission of a Written Scheme of Investigation (WSI) for archaeology · No occupation until the WSI requirements have been completed and agreed
· Submission of a Travel Statement and Travel Plan if the employees exceed 50no.
· Submission of a Construction Management Plan
· At least 10% of energy requirements from renewable sources
· Provision of two barn owl nesting boxes to be erected poles in the hedgerow along the southern boundary – Location of nesting boxes to be agreed
And the following informative notes as summarised:
· Proactive NPPF working statement
· SCC Highways notes
· Support for sustainable development principles
· Any works to a watercourse may require consent under section 23 of the Land Drainage Act 1991
· Any discharge to a watercourse or groundwater needs to comply with the Water Environment (Water Framework Directive) (England and Wales) Regulations 2017
· Any discharge of surface water to a watercourse that drains into an Internal Drainage Board catchment is subject to payment of a surface water developer contribution
· Any works to lay new surface water drainage pipes underneath the public highway will need a section 50 license under the New Roads and Street Works Act 1991
· Any works to a main river may require an environmental permit
· Trenches dug during the construction phase recommended to be covered at night or planks left in to enable animals to escape
· Reporting of unexpected contamination